GROUP MEETING MINUTES

MINUTES FROM MEETING WITH GROUP MEMBERS and advisor

Start 5:30pm

-Semester expectations

-Example project minutes(Essie)

-Project rubric

             Implementation grade is solely off industry professionals

-Syllabus review

-Project touch-base

             Update landing page(match Convey IQ)

             Update following tabs:

             Redefine requirements and separate from implementation

             Redefine block diagrams

             Keep detailed progress log

             Track codes and standards and citations as we work on them

-Conduct survey

End 7:10pm

Start: 6:30 pm

Professor reviewed everyone’s websites and suggested updates across the board to everyone’s website from the proposal class.

Progress log page:

->should provide updates, can add pictures and video

   Ex: put in the cadd models

Update the following pages to match everything else:

1. Financial budget page

2. Proposal Ideas

3. Preliminary drawings

4. Survey page(*was messed up due to AI on wix*)

5. Proposal Testing and result fix the header

6. Proposal final report and presentation

7. CADD drawings

8. Code and standard

Progress log- get rid of the link on top and put it in Project tab

Scale back project to only 1 joint:

  ->not enough time for 2 joints, only need 1 to prove the point

  ->only use wrist joint

  ->make it a grabbing mechanism

Documents:

  ->create document on why we are not using NFC and Qi charging

        ->discuss this during presentation at end oof semester

Specifications:

  ->Update components that are going to be used in the project

  ->upload spec sheets of components

  ->description of specifications

Block Diagram:

  ->update to be for each component

Task clear up:

  ->describe week, group contribution, and individual contributions

end: 7:26pm

Start 8:02 pm

reviewed last week notes

      -block diagram needs update

             -Control block diagram is just the raspberry pi and HMI system

             -Create electrochemical module

      -Engineering Specifications needs update
             -Component detail->make descriptions more vague, not exact components. ex: 5Vpower supply not puls 5v-120vdcxxxxx

     -Project Timeline 

            -needs to be its own page, include an updated gnatt chart and weekly timeline

     -Progress log

            -Text log of individual contributions, not pictures. pictures help to enforce what progress was made

     -Engineering requirements

            -get rid of first one: "The system Shall be able to swap components in under five minutes"

           -Combine these into 1 requirement

​             "The system shall have Individual functional modules that can be replaced by pre-assembled unit for maximum efficiency.
​             " The system shall disengage the modules via a button press"

           -Keep:

            "The system shall have Integrated safety mechanisms prevent mechanical collapse if electrical supply is severed."

           -get rid of smart goals and convert that into a timeline on Project timeline page

          -engineering requirements should be in the form of a table.

         -simplify requirements:
                 What it does

                 Safety mechanism

Main Project:
    -Make 1 joint, with it disconnecting and reconnecting it proves the projects purpose. no need for multiple joints
Goals for this week:

     Troy:

          Work on finishing  ki-cadd PCB board
          Assemble components that have arrived
          HMI hook up with the raspberry pi
     Michael:

          Work on updated CADD drawing to see limitations that might occur with housing print

      Group

           Both work on programming of the entire project
End  8:39pm

Start: 5:30 pm

Notes for the website:

In group meeting tab add 9/1/26

Weekly timeline

   ->be more specific for task to complete

   ->example Esse

Gannt Chart

   ->add the report preparation, and presentation preparation and delivery

Progress log

   ->edit progress log to have week date 

   ->suppose to be an explanation of what's on the time and effect table

   ->Add deception of what CADD drawings are for 

   ->be more specific with progress logs

   ->Add in any troubleshooting processes

Time and effort table

   ->split from proposal

Codes and standards

   -> mention relevance to project and why that code applies

   ->add  Canbus code and standards

Engineering Requirements

   ->clean up requirement 1,remove "without worrying"

   ->requirement 1 should be the main operational requirement

   ->only have requirements that apply to our system

   ->more specific on requirements no emotions

   ->change one of the requirements to state "disengage module power and communication connection with the press of a button

   ->change one of the requirements to state "under normal operation it should not detach"

   ->figure out how to prove its not going to disconnect while moving

Can use Chatgpt to help clean up Website

Home page

   ->rewrite to clean up as it was changed by AI

Block Diagram

   ->4 modules in the system:control,electro-mechnical, power, mechnical

Engineering Specification

   ->Don't repeat labels on the left side

   ->Don't use wix to create the table, create in excel

   ->Don't put the exact component name put specification

​

​

Start: 6:30 pm

Website Updates:

Weekly Timeline:

   ->Should be contributions of each member

   ->Create timeline to be weekly, not the whole month. Specify jobs to be done per week

   ->Example Esie

Home brew example for engineering requirements

Progress Log->latest should be on the top

Engineering requirements:

   ->1rst requirement is still too vague, define what the module is, aka "wrist"

   ->4th requirement, add in wording "for system integrity"

   ->2nd requirement is good

   ->rewrite requirements to only apply to actual project, not future items

        ex:'have a grabber wrist that can be removed and replaced without "screws"

        ex:'HMI to engage and disengage

Component details:

   ->separate hardware and components

         hardware: 3D print, strut

         Components: motor, gearbox, electromagnet

Home page:

   ->add CADD drawings

   -> add phrase about no 'existing solutions'

Time and effort table

   ->update for Michael time and effort

Talked about deliverables and past work

   ->Troy:HMI box, PCB

   ->Michael: 3D print, hardware for HMI box, Website

end: 7:26pm

Start 5:32 PM

Reviewed website:

    -timeline doesn't change->its an established timeline done during senior proposal

          variations are mentioned in time and effort table or progress log

    -Weekly timeline

          -add individual tasks per person

         -Repeat per week if task take longer then one week

    -Engineering requirement

         -Still need to rework, should be along the lines of 'Shall have a base connected to a wrist that with the push of             a button can be replaced

        -The system requirements should only be for our project scope

        -update requirements and concentrate on the wrist aspect

    -Block diagrams

       -Update Motor controller 1 to Motor controller 2

   -Engineering Specifications

       -Specifications should be minimal not exact, ex: microcontroller with 12 outputs, instead of Ardunio exact                   specs

       -Change hardware module to match block diagrams

              -electro-mechanical module

              -hardware module should just have hardware

    -Group task

        -distribution of task

    -Survey-asked if we did it

        -No, but we did receive feedback in design elements of our project, this will be written up during the final                        report

End 7:00pm

​

Start 6:00 pm

Reviewed Website:

    -Timeline->discussed how it has changed from original to realistic

Withdrawal deadline is Oct 30th

   -Progress log:

          -Spell check

   -System requirements

         -grammar and spell check

         -remove the "system shall" from the top.

         -minor rework and update requirements

         -4th condition, update to include what conditions it won’t collapse in

    -Engineering specifications

        -add in @ least or no more than for the specific requirements

       -update HMI to include specifications

       -electromagnet holding force

   -Block diagram

       -review Essie, create an overall block diagram for whole system

​

Troy goals: program HMI, solder PCB

Michael goals: wire fixture, make base

end 6:30PM